I am buying or accepting a PCHE.
What should I do before that?

decision, not an assumption.

Before you specify, accept or take delivery of a PCHE, you need independent confirmation that the technology is right for the duty, that the proposal meets the specified conditions, and that the unit was actually built the way it was specified — in the factory, at the hold points, on your behalf.

White funnel icon with dots entering the top on a blue square background.

RightFit

No items found.

Is a PCHE the right choice for this duty?

Independent technology selection, fit-for-duty and specification support to establish whether a PCHE is the right choice — and the optimal configuration — then define exactly what should be purchased.

  • We are evaluating bids on a technology we do not specify every day.
  • A PCHE has been proposed and nobody has independently confirmed it is the right choice for this duty.
  • Two proposals use different assumptions and there is no independent way to compare them like-for-like.
  • The specification was drafted by the same people it will be tendered to.
  • A specification that is wrong at this stage becomes the wrong yardstick for everything that follows.
  • A datasheet needs to define exactly what should be purchased, not just what is wanted.
Icon showing four white corner brackets forming a square around an orange check mark on a blue background.

ClearView

No items found.

Who verifies the proposal before you accept it?

Independent thermal, hydraulic and mechanical verification of the proposed design against the actual duty, the applicable codes and the required operating envelope — before acceptance.

  • A proposal has arrived and no one has independently checked the numbers behind it.
  • Performance guarantees look good on paper, and commissioning is where untested assumptions get found out.
  • Compliance with the applicable code is claimed but not independently confirmed.
  • The design margin looks optimistic and no neutral party has reviewed it.
  • Flow distribution and maldistribution have been assumed, not independently checked.
  • Acceptance is approaching and the proposal has never been verified against the specified duty.
White hamburger menu icon above an orange check mark on a dark blue background.

TrueWeld

No items found.

How do you trust a bond you can never inspect again?

Independent oversight of diffusion-weld quality — inspection planning, manufacturing surveillance and factory acceptance testing, through to sign-off.

  • Once the block is diffusion-welded, that bond can never be inspected again.
  • A factory acceptance test is scheduled and no independent witness has been arranged.
  • Manufacturing is underway and no one is watching on the buyer's behalf.
  • A deviation request has arrived from the fabricator and needs an independent view.
  • Weld quality is being assured through paperwork alone, and nothing else.
  • Most buyers cannot economically place a specialist in the factory at every hold point.
learn more about

Provided
Perspectives.

get started

The unit cannot be opened. The decision still has to be made.

Before you accept it, or before you clean it — talk to us first.

Close-up of stacked zigzag metal plates creating a repeating chevron pattern.